Deposit Plan

Ends on 9th December 2026 (42 days remaining)

9 Productive and Enterprising Places Comment

Employment Comment

9.1The national strategy ‘Prosperity for All: economic action plan’, prepared by Welsh Government, sets out a clear statement of intent to build an economy on strong foundations, to develop Wales’ industries of the future and empower all the regions to become more productive.

9.2In seeking to support the national strategy, PPW requires local planning authorities to encourage and support developments which generate economic prosperity and regeneration. This is to be enabled through development proposals that contribute toward building a strong, responsive and competitive economy. As such local planning authorities must ensure that sufficient land of the right type is available in the right places and at the right time to support growth and innovation.

9.3The County Borough is located within the Cardiff Capital Region City Deal (CCRCD) area. In economic terms the CCRCD seeks:

  • To deliver a 5% uplift in the GVA for the region,
  • To create up to 25,000 new jobs in the region.

9.4The 2RLDP has acknowledged and reflected this as part of its underlying strategy, by seeking a level of growth that will deliver an economically active population to bring about a potential increase in jobs commensurate to the CCR ambitions. To do this the 2RLDP will need to identify land for employment development that will assist in addressing economic pressures and take into account the resilience of its existing, economic base.

SP12: Managing Employment Growth Comment

In accordance with Policy SP1 and in order to meet the requirement of 40.3ha of employment, a range of sites are allocated and protected for class B use, to be categorised as follows:

  1. Business parks;
  2. Primary employment sites;
  3. Secondary employment sites.

9.5In order to support the local economy, 40.3ha of land is allocated for new employment-related development. This involves the provision of a range of employment sites across the County Borough. The plan allocates and protects a range of employment sites that cater for a wide- range of employment uses. To facilitate this the policy sets out three categories of employment sites. The categories of site incorporate a degree of flexibility (see Policy EM3: Use Class Restrictions – Business and Industry) in terms of the range of permissible uses across the portfolio of allocated land.

EM1: Allocated Employment Sites Comment Heads of the Valleys Industrial Estate (1) Ty Du (2) Tredomen Extension (3) Plateau 1 Oakdale (4) Plateau 2 Oakdale (5) Plateau 4 Oakdale (6) Land at Trecenydd Industrial Estate (7) Hawtin Park North (8)

The following sites are allocated for class B use, in accordance with their respective designations as set out in Policy SP12:

Site Ref

Site Name

Settlement

Size (Ha)

Type

EM1.1

Heads of the Valleys Industrial Estate

Rhymney

5.2

Primary site

EM1.2

Land at Ty Du

Nelson

2.8

Business park

EM1.3

Tredomen Extension

Ystrad Mynach

4.2

Business park

EM1.4

Plateau 1, Oakdale Business Park

Oakdale

17.8

Primary site

EM1.5

Plateau 2, Oakdale Business Park

Oakdale

7.0

Primary site

EM1.6

Plateau 4, Oakdale Business Park

Oakdale

2.0

Primary site

EM1.7

Land at Trecenydd Industrial Estate

Caerphilly

1.3

Secondary site

 Additional sites not counting towards the employment land supply

Site Ref

Site Name

Settlement

Size (Ha)

Type

EM1.8

Hawtin Park North

Pontllanfraith

4.5

Primary site

EM2: Safeguarded Employment Sites Comment

The following sites are safeguarded for class B use, in accordance with their respective designations as set out in Policy SP12:

Site Ref

Site Name

Settlement

Type

EM2.1

Heads of the Valleys Ind Est

Rhymney

Secondary site

EM2.2

Capital Valley Ind Est

Rhymney

Secondary site

EM2.3

Maerdy Ind Est

Rhymney

Secondary site

EM2.4

New Tredegar Business Park

New Tredegar

Primary site

EM2.5

Angel Lane Ind Est

Aberbargoed

Secondary site

EM2.6

Bowen Industrial Estate

Aberbargoed

Secondary site

EM2.7

Ty Du

Nelson

Business park

EM2.8

Tredomen Park

Ystrad Mynach

Business park

EM2.9

Dyffryn Business Park

Ystrad Mynach

Primary site

EM2.10

Tiryberth Industrial Estate

Tiryberth

Secondary site

EM2.11

Penallta Industrial Estate

Hengoed

Secondary site

EM2.12

Britannia Industrial Estate

Pengam

Secondary site

EM2.13

St. David’s Industrial Estate

Pengam

Secondary site

EM2.14

Hawtin Park

Pontllanfraith

Primary site

EM2.15

Newbridge Road Ind Est

Blackwood

Secondary site

EM2.16

Tram Road Industrial Estate

Blackwood

Secondary site

EM2.17

Blackwood Business Park

Blackwood

Secondary site

EM2.18

Penmaen Industrial Estate

Blackwood

Secondary site

EM2.19

Woodfieldside Business Park

Blackwood

Secondary site

EM2.20

Plateau 1, Oakdale Business Park

Oakdale and Croespenmaen

Primary site

EM2.21

Plateau 2, Oakdale Business Park

Oakdale and Croespenmaen

Primary site

EM2.22

Plateau 4, Oakdale Business Park

Oakdale and Croespenmaen

Primary site

EM2.23

Penyfan Industrial Estate

Oakdale and Croespenmaen

Primary site

EM2.24

Croespenmaen Industrial Estate

Oakdale and Croespenmaen

Secondary site

EM2.25

Nine Mile Point Ind Est

Cwmfelinfach

Secondary site

EM2.26

Blackvein Ind Est (north and south)

Wattsville

Secondary site

EM2.27

North Celynen (South)

Newbridge

Primary site

EM2.28

Prince of Wales Ind Est

Abercarn

Secondary site

EM2.29

Newtown Industrial Estate

Crosskeys

Secondary site

EM2.30

Park Road Industrial Estate

Risca and Pontymister

Secondary site

EM2.31

Rogerstone Park

Risca and Pontymister

Secondary site

EM2.32

Caerphilly Business Park

Caerphilly

Primary site

EM2.33

Pontygwindy Industrial Estate

Caerphilly

Secondary site

EM2.34

Trecenydd Industrial Estate

Caerphilly

Secondary site

EM2.35

Western Industrial Estate

Caerphilly

Secondary site

EM2.36

Pantglas Industrial Estate

Bedwas and Trethomas

Primary site

EM2.37

Bedwas House Ind Est

Bedwas and Trethomas

Secondary site

9.6The above policies categorise employment sites to ensure that the appropriate employment uses are focussed to the right employment sites. This seeks to ensure effective management of employment growth and development throughout the County Borough, delivering the anticipated employment growth and meeting national and regional growth ambitions. The categorisation applies to both proposed and existing employment sites and proposals for uses as referred to below and indicated by the relevant categorisation (e.g. Use Class B1 only for Business Parks).

EM3: Use Class Restrictions – Business and Industry Comment

Proposals will be subject to the following restrictions:

  1. On sites identified as business parks, proposals will only be permitted if they are:
    1. Within use classes B1 or B8; or
    2. To provide an ancillary facility or service to the primary employment use.
  2. On sites identified as primary employment sites, proposals will only be permitted if they are:
    1. Within use classes B1, B2 or B8; or
    2. An appropriate ’unique use’; or
    3. To provide an ancillary facility or service to the primary employment use.
  3. On sites identified as secondary employment sites, proposals will only be permitted if they are:
    1. Within use classes B1, B2 or B8; or
    2. An appropriate ’unique use’; or
    3. To provide an ancillary facility or service to the primary employment use; or
    4. An acceptable commercial service unrelated to any class B use.

9.7Industrial estates within the County Borough comprise businesses that are categorised within use classes B1, B2 and B8 of the Town and Country Planning Use Classes Order, although there are also examples of ’unique uses’ and, to a very limited extent, other non-class B uses on a number of sites. Every site allocated or safeguarded for class B2 use is considered suitable, in principle, for the location of in-building waste management facilities.

9.8Examples of appropriate ’unique uses’ would include builders’ merchants, freight contractors’ yards, vehicle depots and taxi control offices. Examples of commercial services unrelated to class B use which might be considered acceptable on secondary employment sites include indoor fitness and play facilities, day nurseries, and commercial vehicle repair and maintenance businesses. The examples given are not intended to constitute an exhaustive list and each proposal will be considered on its merits although, generally, A1 (retail) uses would not be considered acceptable. Proposals for such uses will be considered against the sequential test for commercial development and the ’Town Centre First’ approach set out in Policy 6 of Future Wales and in PPW.

EM4: Alternative Uses on Allocated/Safeguarded Employment Sites Comment

Proposals for uses outside the range of those considered permissible under Policy EM3 will be required to demonstrate the following:

  1. That the proposal would have a significant community benefit which would outweigh the impact of the site or premises in question, or part thereof, being utilised for an alternative use; and
  2. That the site or premises in question, or part thereof, is no longer suitable or capable of being utilised for its identified use, having been proactively marketed for such a use for a reasonable period at a market rate as supported through a documented, formal marketing campaign undertaken by a suitably qualified and experienced commercial property agent and/or valuer and that, consequently, it is considered unlikely to come forward for its identified use.

The assessment of proposals against the provisions of this policy will, where relevant, be subject to the application of Future Wales Policy 6 - Town Centre First.

9.9TAN 23: Economic Development requires the inclusion of a criteria-based policy to control the release of non-class B uses on employment sites. While policy EM3 adopts a flexible approach by setting out the range of permissible uses on identified sites in accordance with the categorisation specified, there are instances where proposals will come forward for uses outside of this range. It is recognised that the policy framework needs to be sufficiently flexible to take account of changing economic conditions and allow for the release of employment land in very limited circumstances. Therefore, it is considered appropriate for such proposals to be required to demonstrate that such economic conditions have been satisfied before being considered acceptable. In respect of the second criterion, it is considered that sites/premises should be marketed for a period of not less than six months.

9.10Future Wales Policy 6 - Town Centre First requires that new commercial, retail and community-orientated facilities of a significant scale must be located within town centres, with this approach also being encouraged for smaller schemes. Consequently, this policy will be applied within this context, and proposals for such uses will be considered against the sequential test for commercial development set out in national policy.

Tourism and the Visitor Economy Comment

9.11In addition to increasing the employment base the 2RLDP will also seek to expand and enhance the town centre and visitor offer to assist in generating economic growth for the County Borough. Tourism makes an important contribution to the local economy. Regeneration activities are focussing on the enhancement of tourism generally, along with widening and encouraging tourist related activities and the development of visitor accommodation. A key element in delivering an improved visitor offer is increasing accessibility through sustainable transport, including metro improvements and local active improvements which link tourist assets together.

TM1: Managing Tourism Growth Comment

The Council will seek to expand and enhance sustainable tourism in the County Borough through:

  1. Facilitating the development of sustainable visitor attractions and events;
  2. Facilitating the development of visitor accommodation in appropriate locations;
  3. Improving accessibility to visitor attractions and events through maximising sustainable transport and active travel; and
  4. Protecting and enhancing the County Borough’s natural and historic assets that give the County Borough its unique identity.

9.12Tourism is a vital contributor to Caerphilly’s economy and cultural identity, offering opportunities for regeneration, job creation, and community well-being. The County Borough boasts significant heritage assets such as Caerphilly Castle, historic landscapes, and natural attractions like Cwmcarn Forest, which collectively underpin its visitor economy. However, unmanaged tourist growth could lead to adverse environmental impact, increased pressures on infrastructure, loss of character and negative impacts on community well-being and placemaking.

9.13To deliver this, the 2RLDP promotes a sustainable approach to tourism development, ensuring that growth aligns with placemaking principles, climate resilience and community well-being. The plan aims to maximise economic and social benefits while minimising environmental harm, ensuring that Caerphilly remains an attractive, resilient and sustainable destination for future generations.

TM2: Tourist and Visitor Economy Development Comment

Development proposals that support and enhance the County Borough’s tourist and visitor economy will be permitted where:

  1. The proposals promote sustainable forms of tourism;
  2. The proposals do not prejudice regeneration proposals or existing tourist facilities;
  3. The proposals do not result in unacceptable environmental and landscape impacts;
  4. The proposals do not adversely impact surrounding land uses.

9.14To deliver sustainable tourism growth the 2RLDP seeks to maximise opportunities for improving and co-ordinating the range of tourist accommodation, facilities and attractions in the County Borough. This policy seeks to encourage tourism related development, which increases the range of activities available to visitors in appropriate locations, whilst resisting development proposals that could result in adverse impacts.

9.15Tourism development projects are an important part of the regeneration of the Town Centres in the County Borough. The Council has prepared regeneration plans for its centres and tourist related development is a key part of these. Where proposals are proposed in Town Centres, they should positively contribute towards both broadening the visitor offer and positively contributing toward the night-time economy where appropriate.

TM3: Protection of Existing Tourism Facilities Comment

Proposals that would result in the loss, or reduction in scale, of an existing tourist facility will only be permitted where:

  1. The loss would not adversely affect the range and quality of tourism facilities available within the locality and the County Borough; and
  2. It can be demonstrated that the facility is no longer suitable or financially viable and could not be expected to become financially viable for tourism use.

9.16This policy seeks to retain existing tourist facilities to maintain the tourism variety and choice in the County Borough. The loss of a tourist facility to another use would only be acceptable where it can be demonstrated that the facility is no longer suitable or viable for tourism use, and its loss would not adversely affect the range and quality of tourism facilities available within the locality and the County Borough. To support an application for the change of use from a tourist facility the developer would need to provide the following information as part of a planning application:

  • The length of time a facility has been vacant and the reasons why it is vacant, such as
    • Patronage information
    • Customer preferences
    • Occupancy rates (for tourist accommodation)
  • Details demonstrating that the site has been marketed for tourism use at a reasonable price for an appropriate period
  • The suitability of the building for an appropriate tourist use.

TM4: Protection of Significant Tourist Assets Comment

The following significant tourist assets are identified to protect their tourism use and proposals for their enhancement will be supported:

  • TM4.1 Cwmcarn Forest
  • TM4.2 Caerphilly Castle

9.17Caerphilly Castle and Cwmcarn Forest are the principal tourist attractions in the County Borough, and it is essential that their tourist use be protected.

9.18Caerphilly Castle is one of Wales’s most iconic heritage landmarks and the largest castle in Wales. It is a major draw for domestic and international visitors and plays a central role in the County Borough’s cultural identity and tourism economy, supporting the regeneration of Caerphilly town and contributing to placemaking objectives by anchoring Caerphilly town as a vibrant commercial and cultural hub, contributing to local businesses and the night-time economy. Cadw, who own the castle, have invested £10mto deliver significant improvements to the Castle as part of their proposal to make the castle a national designation for tourists. These improvements include:

  • Construction of a new visitor centre featuring a café, toilets, shop, and educational space.
  • Restoration of the Great Hall (medieval banqueting hall),
  • Refurbishment of the Inner East Gatehouse (new roof and windows),
  • Reopening of the medieval watergate access channel.
  • Wider access paths, ramps, and underfloor heating in key visitor areas.
  • Installation of comprehensive interpretation and interactive exhibits, digital displays, audio-visual storytelling, and a wildflower garden.

9.19Cwmcarn Forest is a premier outdoor recreation destination offering mountain biking, hiking, and nature trails. It is integral to the County Borough’s active tourism and promotes health and well-being through outdoor activity and supports sustainable tourism by encouraging active travel and eco-friendly experiences. The forest complements heritage tourism by diversifying the visitor offer, attracting adventure tourists and families, and contributing to rural economic development.

Digital Infrastructure Comment

9.20Digital infrastructure is a critical component of productive and enterprising places, underpinning economic growth, social connectivity and access to services in an increasingly digital society. Electronic communications is an essential infrastructure and planning authorities should support high‑quality digital networks, such as broadband and mobile connectivity, to ensure that homes, businesses and communities are well‑connected and resilient to future technological demands.

DI1: Digital Infrastructure Comment

Proposals for telecommunications and digital technology infrastructure will be considered in light of technical and operational requirements and permitted where:

  1. The development contributes towards the objectives of future proofing development and regeneration proposals or forms part of the planned development of a wider network; and
  2. The development incorporates all reasonable measures to minimise any significant adverse impact due to the siting and external appearance of the apparatus, and the design minimises impact caused by its visual appearance; and
  3. There would be no significant adverse effect on natural heritage, the historic environment, or amenity of neighbouring residents; and
  4. The application is accompanied by evidence of compliance with government guidelines on health impacts of telecommunications infrastructure.

9.21Adequate and efficient telecommunications and digital technology infrastructure is increasingly crucial for economic, social and environmental sustainability. Secure electronic communications underpin economic competitiveness and can provide opportunities for households and businesses to achieve socially and environmentally desirable ways of living and working. Future Wales outlines how digital communications infrastructure is vital to the future success and economic competitiveness of businesses and supports the provision of digital communications infrastructure and services across Wales and requires new developments to include the provision of high-speed broadband infrastructure from the outset.

9.22This policy supports telecommunications infrastructure development where it is required, whilst safeguarding against any adverse impacts on residential amenity, natural and built heritage assets, sensitive landscapes and other environmental designations. Developers should proactively engage with owners or operators of sensitive uses (such as hospitals, childcare facilities or educational establishments) early in the development process to discuss any technical or other amenity issues that may arise as a result of the development.

Energy and Decarbonisation Comment

9.23The 2RLDP promotes sustainable economic growth to assist in delivering economic growth in line with the plan’s strategy and the aspirations of the CCR. Decarbonisation is essential in addressing climate change and the planning system is an important vehicle for delivering this. The 2RLDP will need to support the following strategic decarbonisation goals if it is to deliver sustainable growth for the County Borough:

  • Strategic Placemaking;
  • Promotion of renewable energy generation and use;
  • Reducing and restricting the use of fossil fuels;
  • Promoting modal shift and prioritising active travel and sustainable transport.

9.24Growth across the County Borough will require energy and the 2RLDP seeks to promote renewable and zero carbon energy generation within the County Borough to assist in delivering decarbonisation.

Renewable Energy Targets Comment

9.25PPW requires local authorities to identify challenging but achievable targets for renewable energy within the local development plan.

9.26The Welsh Government’s Practice Guidance: Planning for Renewable and Low Carbon Energy – A Toolkit for Planners (Sept 2015) is advocated within PPW as an acceptable methodology for developing an evidence base to inform spatially based renewable energy policies and allocations for inclusion in the 2RLDP. A Renewable and Low Carbon Energy Assessment (RLCEA) was prepared by the Carbon Trust in 2020. This assesses the current capacity for renewable energy within the county borough and the potential renewable energy capacity for the future as well as theoretical capacities for renewable energy generation.

9.27The Caerphilly Local Area Energy Plan (LAEP) sets out to achieve ‘Net Zero’ carbon emissions by 2050. It collates evidence to identify the most effective route for the authority to reach a net-zero target, in line with national renewable energy generation targets.

9.28Using the LAEP, the RLCEA and other evidence, as detailed in evidence base paper EB24: Renewable Energy a measurable target has been calculated from the resource potential of the area. Table 2 identifies the renewable energy target for the 2RLDP.

Table 2 Renewable Energy Target

Resource Based Target

Energy Technology

Estimated Theoretical Maximum (ETM)

Current installed capacity

Low Target (inclusive of current installed capacity)

High Target (Inclusive of current installed capacity)

Comments

Power

MW

MWh p.a.

MW

MWh p.a.

MW

MWh p.a.

MW

MWh p.a.

Onshore Wind

137

314,000

18

33,000

110.4

261,000

205

485,000

High target exceeds the ETM as this was calculated assuming 2MW turbines. Approved planning applications to be constructed within the plan period specify larger turbines and exceed the ETM for the RLCEA identified less constrained area in which they are situated by 61.9MW. Applications awaiting determination similarly specify larger turbines and exceed the ETM for the RLCEA-identified less constrained areas by 60.6MW. Stakeholder engagement has suggested that no additional DNS installations will be likely within the plan period.

Ground Mounted Solar (excluding land classification grades 1-3)

740

719,000

41

35,000

96

93,000

136

132,000

ETM for solar derived from Caerphilly's LAEP.

Target aligned with 2RLDP Growth Strategy

Low Target (new allocations only)

High Target (new allocations only)

MW

MWh p.a.

MW

MWh p.a.

Roof Mounted Solar PV (realigned with the 2RLDP growth rates)

Targets relate to new development only, linked to the 2RLDP growth strategy

16

14,000

5.53

5,400

11.1

10,800

Approximately 2,767 new housing units through allocations within the plan; the targets do not include homes already under construction, existing dwellings or commercial properties.
Low target assumes 50% uptake and availability; High target assumes 100% uptake and availability.

Total Power

75

82,000

212

359,400

352

627,800

Heat

Heat Pumps (realigned with the 2RLDP Growth Rates)

Targets relate to new development only, linked to the 2RLDP growth strategy

1.73*

Not reported

6.9

11,000

13.8

22,100

Approximately 2,767 new housing units through allocations within the plan; the targets do not include homes already under construction, existing dwellings or commercial properties.
Targets assume a Co-efficient of Performance of 3 and are calculated utilising estimated heat demand for 2,767 properties. The low target represents heat demand of 4 MWh/home/year with 50% uptake and the high target 8 MWh/home/year with 100% uptake.

Total Heat

6.9

8,000

13.8

16,100

Total Heat and Power

82,000

219

367,400

366

643,900

9.29Future Wales requires Council’s to be proactive in delivering renewable energy generation and identifies Pre-Assessed Areas throughout Wales where large-scale wind energy is, in principle, acceptable and where the principle of landscape change is accepted. On a more local scale the Council will support and encourage appropriate schemes for renewable energy generation and will also work together with energy providers to deliver appropriate schemes.

EN1: Renewable Energy Generation Comment

Development proposals for renewable and low carbon energy development, including associated infrastructure, will be permitted where:

  1. It has been demonstrated that a less sensitive or viable alternative site is not available;
  2. Grid and off-grid connection opportunities have been fully explored and optimised;
  3. The proposal would not give rise to unacceptable cumulative impacts when considered alongside existing or consented developments;
  4. There would be no unacceptable adverse impacts on landscape character, or the distinct identity of the County Borough;
  5. Exisiting features of biodiversity are maintained, with a net benefit for biodiversity secured wherever possible;
  6. Residential amenity would be protected, with no unacceptable impacts arising from noise, dust, odour, traffic, or other disturbances across all phases of the development;
  7. Provision is made for the decommissioning, removal of infrastructure, and restoration of the site to an agreed standard at the end of its operational life;
  8. The overall benefits of the proposal, including environmental, economic, social, and community benefits, clearly outweigh any residual adverse impacts.

9.30To further promote energy efficiency, PPW requires applications for major development to be accompanied by an Energy Report.

EN2: Renewable Energy Generation on Large Sites Comment

All new residential development for 100 or more residential units or new development with a total floorspace of 1000 sq.m. or more will be required to submit an Energy Report in order to determine the feasibility and viability of incorporating renewable energy generation, district heating networks and/or on-site zero / low carbon technology (including microgeneration technologies) within the development.

9.31The Council will require applications that meet the provisions of this policy to be accompanied by an 'Energy Report'. The assessment will be required to set out how the proposal can make a contribution towards increased levels of energy generation from renewable and low carbon sources and whether or not any connections can be made to existing sources of renewable energy.

Minerals Comment

9.32The 2RLDP, in accordance with national and regional policy requirements, encourages a sustainable approach to minerals planning, ensuring that valuable, finite resources are safeguarded for possible, future extraction whilst requiring that proposals take account of environmental and amenity considerations and seek to avoid significant adverse impacts, including through the use of appropriate restoration and aftercare measures.

9.33Whilst Future Wales identifies minerals as a policy area to be addressed through the preparation of the SDP, PPW and MTAN1 require that the 2RLDP maintains a 10-year land bank for crushed rock (the County Borough has no history of land-based sand and gravel production) throughout the plan period.

MN1: Minerals Comment

The Council will contribute to the demand for a continuous supply of minerals by:

  1. Safeguarding known resources of sand and gravel; and crushed rock;
  2. Maintaining a minimum 10-year land bank of permitted aggregate reserves throughout the plan period;
  3. Encouraging the efficient and appropriate use of high-quality minerals, safeguarding minerals infrastructure and maximising the potential for the use of secondary and recycled aggregates as an alternative to primary land won resources.

9.34To facilitate this, MTAN 1 requires the preparation of Regional Technical Statements (RTS). The RTS 2nd Review was published in September 2020 and was endorsed by the Council in January 2021. It identified a total apportionment for the County Borough over 25 years of 13.37 mt (million tonnes), representing a surplus of 17.91 mt in permitted reserves. At the time of publication, the County Borough had a landbank of 58.5 years, greatly in excess of the minimum ten-year requirement.

MN2: Sustainable Development of Mineral Resources Comment

The extraction of mineral resources will be permitted where such proposals satisfy the following criteria:

  1. It can be demonstrated that extraction is required to meet national, regional or local need, and that such a need cannot be met from secondary or recycled materials or existing reserves;
  2. The proposed end use is appropriate and represents an efficient and sustainable utilisation of the resource;
  3. The proposal would not cause demonstrable harm to residential amenity, particularly with regard to access, traffic generation, noise, vibration, dust, air quality and odour;
  4. The proposal would not result in significant adverse impacts in terms of the following:
    1. public health;
    2. the landscape, natural heritage, and the cultural and historic environments;
    3. the quality and quantity of controlled waters, and the existing water and sewerage infrastructure;
    4. agricultural interests;
    5. subsidence and ground instability.
  5. Opportunities for the re-use and/or recycling of mineral waste would be maximised;
  6. Extracted minerals would be transported by rail, wherever feasible; and
  7. Appropriate restoration and aftercare proposals have been submitted, including post-closure site management.

9.35In accordance with the recommendations set out in the RTS 2nd Review, no future provision for primary aggregates, including allocations for future working, have been identified within the 2RLDP. However, the minerals industry remains active in the County Borough with limestone and sandstone continuing to be worked at different sites. Minerals are an important resource which should be protected for future generations in appropriate areas. Policy MN2 sets out the criteria against which all proposals for new mineral working will be assessed and adheres to the requirements of national policy.

MN3: Safeguarding Areas Comment

The following areas are identified as being safeguarded for the winning and working of aggregates, as specified:

  1. Category 1 Safeguarding Areas:
    1. Sand and gravel;
    2. High specification aggregate – sandstone;
    3. High specification aggregate – carboniferous limestone
  2. Category 2 Safeguarding Areas:
    1. Sand and gravel;
    2. Sandstone;
    3. Limestone

9.36Safeguarding areas for limestone, sandstone (including high specification aggregate) and sand and gravel are delineated on the proposals map, in accordance with the Aggregates Safeguarding Map of South East Wales.

MN4: Development in Safeguarding Areas Comment

Development proposals which may impact on minerals safeguarding areas will be considered against the following requirements, as applicable:

  1. A Proposals for permanent uses within identified safeguarding areas will not be approved unless:
    1. It can be demonstrated that the mineral is no longer of any value or potential value; or
    2. The mineral can be extracted satisfactorily prior to the development taking place; or
    3. There is an overriding need for the development; or
    4. The proposal comprises infill development within a built-up area, householder development, or an extension to an existing building;
  2. Proposals for temporary uses within identified safeguarding areas will not be approved unless:
    1. They can be commenced and completed; and
    2. The site restored to a condition that does not inhibit mineral extraction;

within the timescale in which the resource is likely to be required.

9.37It is important that access to mineral resources is safeguarded in order to prevent sterilisation by other forms of permanent development. Safeguarding does not indicate an acceptance of mineral working, but that the location and quality of the mineral is known and that the environmental constraints associated with extraction have been considered.

MN5: Buffer Zones Comment

Proposals for the winning and working of minerals, and sensitive uses involving the occupation by people on a regular basis, will not be permitted within the following minerals site buffer zones:

  • MN5.1 Bryn Quarry – active
  • MN5.2 Gelligaer Quarry - active
  • MN5.3 Caerllwyn Quarry – dormant
  • MN5.4 Hafod Fach Quarry – active
  • MN5.5 Pontymister Quarry – dormant
  • MN5.6 Machen Quarry – active
  • MN5.7 Cefn Onn Quarry – dormant
  • MN5.8 Cwmleyshon Quarry – inactive
  • MN5.9 Blaengwynlais Quarry – inactive

9.38Buffer zones provide areas of protection around permitted and proposed mineral workings where further mineral development, as well as new development which would be sensitive to adverse impact including residential, hospitals and schools, should be resisted. Other development which may be less sensitive, including industrial, office and ancillary uses related to mineral working, may be considered acceptable on a case-by-case basis.

9.39Buffer zones of 200m (as required by MTAN 1 in the case of hard rock quarries) have been drawn around active, inactive and dormant sites and are delineated on the proposals map. While dormant sites may retain extant planning permissions due to previous extraction, working cannot resume at those sites without the application of full, modern conditions. In some cases, there may be no prospect of future working, and the Council will consider appropriate strategies for future use and restoration.

MN6: Inactive Sites Comment

Measures to prevent further mineral working and, where appropriate, to consider restoration and landscaping works, will be considered at the following inactive sites:

  • MN6.1 Caerllwyn Quarry
  • MN6.2 Cefn Onn Quarry
  • MN6.3 Pontymister Quarry

9.40This policy seeks to introduce measures to prevent further extraction of minerals at sites that are inactive and mineral working is no longer considered appropriate at these locations. This approach accords with national policy, which states that inactive sites with planning permission for future working which are considered unlikely to be reactivated for the foreseeable future should be identified in the development plan and should be subject to a suitable strategy.

9.41In order to identify such sites, the Council is working with landowners/operators to determine future use on dormant sites. Where sites are identified as being inactive the Council will seek measures to prevent further extraction and to secure restoration and landscaping to eliminate any doubt over possible reworking. Such measures may include mechanisms such as prohibition orders.

Waste Management Comment

9.42Future Wales recognises waste as a policy area requiring a co-ordinated framework through the preparation of an SDP. In the meantime, regional monitoring arrangements inform the preparation of SDPs.

9.43While no specific need for waste management facilities has been identified at a regional level, local authorities are required to develop a sustainable approach to waste management, including the identification of suitable locations for waste management facilities as well as criteria by which applications for such development will be determined, recognising that the most appropriate locations will be those with the least adverse impact on the local population and the environment and with the most potential to contribute to a broad infrastructure framework.

WM1: Sustainable Waste Management Comment

To facilitate the delivery of sustainable management of waste the Plan will:

  1. Ensure that waste management proposals conform to the principles of the waste hierarchy supporting those that move waste up the hierarchy;
  2. Support an integrated and adequate network of waste management installations that has regard to the nearest appropriate installation concept and self-sufficiency principles where necessary;
  3. Consider in-building waste management treatment facilities to be acceptable in principle on sites allocated and safeguarded for class B2 use, subject to Policy WM2 and other, relevant planning considerations; and
  4. Support the circular economy by encouraging the minimisation of the production of waste and the use of reused and recycled materials in the design, construction and demolition stages of development.

9.44Towards Zero Waste sets out the Welsh Government’s high-level policies, targets and principles with respect to waste management. In order to comply with the Waste Framework Directive, the following waste hierarchy is applied as a priority order in waste prevention and management legislation and policy:

  • Prevention;
  • Preparation for reuse;
  • Recycling;
  • Other recovery e.g. energy recovery; and
  • Disposal.

9.45National planning policy requires LDPs to make provision for a diverse waste management infrastructure and ensure that suitable locations are identified for such facilities. Criteria-based policies against which applications for such facilities will be determined should also be included. The pattern and nature of provision should reflect not only national waste policy, but also the up-to-date position as set out in the waste planning monitoring report. LDPs should, in principle, support the aspirations of Towards Zero Waste.

9.46Development, and development plans, should adhere to the principles of the circular economy. This should include promoting reuse; designing out waste; making adaptable design choices; and incorporating recycling facilities into development. The strategic policy set out above adheres to national planning and waste management policy and is designed to frame the context for the criteria-based policy below.

WM2: Waste Management Facilities – Employment Sites Comment

Sites allocated or safeguarded as either primary or secondary employment sites are identified as being suitable, in principle, for new in-building waste management facilities.

Proposals for such uses must:

  1. Comply with the provisions of Policy WM3; and
  2. Demonstrate that they do not conflict with existing, neighbouring uses, or will not prejudice the development of the remainder of such sites for their primary, identified purpose.

9.47TAN 21: Waste notes that existing industrial estates, in general terms, are likely to be suitable for modern, in-building waste management facilities due to their similarity in nature and external appearance to industrial buildings and processes. Notwithstanding this, proposals will need to be assessed in terms of their potential impact on environmental and amenity considerations, particularly with regard to neighbouring land uses. National policy requires waste planning assessments to be undertaken and submitted along with planning applications, in order to demonstrate how proposals meet the overriding objectives of Towards Zero Waste and the Collections Infrastructure and Markets (CIM) Sector Plan.

WM3: Waste Management Facilities Comment

Proposals for new waste treatment facilities will only be permitted where all of the following criteria are satisfied:

  1. There is an identified need;
  2. They accord with the principles of the waste hierarchy, and the Waste Framework Directive;
  3. They would not have a significant adverse impact on amenity or the environment;
  4. They provide for the comprehensive restoration and aftercare of the site, where relevant and appropriate; and
  5. A waste planning assessment has been undertaken.

9.48Whilst new in-building waste management facilities are considered acceptable, in principle, on primary and secondary employment sites, it is considered that allowing for the identification of potentially suitable sites elsewhere, where dependent on need, while also ensuring that relevant proposals are appropriately assessed and deemed to be sustainably located in relation to other forms of development and more peripheral locations, is beneficial. TAN 21 requires that waste planning assessments are undertaken and submitted along with planning applications, in order to demonstrate how proposals meet the overriding objectives of Towards Zero Waste and the CIM Sector Plan.

For instructions on how to use the system and make comments, please see our help guide.